Enter your keyword

2-s2.0-84946690103

[vc_empty_space][vc_empty_space]

Overvoltages and insulation coordination on 150 kV substation in South Sumatera, Indonesia

Setiawan D.a, Khayam U.a, Zoro R.a

a Lightning Research Center, School of Electrical Engineering and Informatics, Bandung Institute of Technology, Bandung, Indonesia

[vc_row][vc_column][vc_row_inner][vc_column_inner][vc_separator css=”.vc_custom_1624529070653{padding-top: 30px !important;padding-bottom: 30px !important;}”][/vc_column_inner][/vc_row_inner][vc_row_inner layout=”boxed”][vc_column_inner width=”3/4″ css=”.vc_custom_1624695412187{border-right-width: 1px !important;border-right-color: #dddddd !important;border-right-style: solid !important;border-radius: 1px !important;}”][vc_empty_space][megatron_heading title=”Abstract” size=”size-sm” text_align=”text-left”][vc_column_text]© 2014 IEEE.Most of the substation in Indonesia has to be check again the performance in overvoltage protection, the use of insulation coordination according to the standard IEC 71-1 has to be applied to the substation. 150 kV Teluk Betung substation in South Sumatera is one of the substation chosen to be observed and studied. The study is being done by observing the number equipment BIL etc. Analysis and evaluation of insulation coordination aims to create a system that are parts, each one and with each other have the insulation endurance that in any operating condition, the electricity supply quality can be achieved technically and economically.[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Author keywords” size=”size-sm” text_align=”text-left”][vc_column_text]Analysis and evaluation,Arrester,Conducting insulator,Electricity supply,Insulation level,Operating condition,Over-voltages,Transient over-voltage[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Indexed keywords” size=”size-sm” text_align=”text-left”][vc_column_text]Arrester,Basic Insulation Level (BIL),Conducting insulator,Insulation coordinationi,Transient Overvoltage[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Funding details” size=”size-sm” text_align=”text-left”][vc_column_text][/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”DOI” size=”size-sm” text_align=”text-left”][vc_column_text]https://doi.org/10.1109/ICPERE.2014.7067204[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/4″][vc_column_text]Widget Plumx[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_column][/vc_row][vc_row][vc_column][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][/vc_column][/vc_row]