Enter your keyword

2-s2.0-84956667198

[vc_empty_space][vc_empty_space]

Smart completion design in cyclic steam stimulation process: An alternative for accelerating heavy oil recovery

Suranto A.M.a,b, Permadi A.K.c, Bae W.a

a Department of Energy and Mineral Resources Engineering, Sejong University, Seoul, 143-747, South Korea
b Department of Petroleum Engineering, Universitas Pembangunan Nasional Veteran Yogyakarta, Yogyakarta, 55283, Indonesia
c Department of Petroleum Engineering, Bandung Institute of Technology, Bandung, 40132, Indonesia

[vc_row][vc_column][vc_row_inner][vc_column_inner][vc_separator css=”.vc_custom_1624529070653{padding-top: 30px !important;padding-bottom: 30px !important;}”][/vc_column_inner][/vc_row_inner][vc_row_inner layout=”boxed”][vc_column_inner width=”3/4″ css=”.vc_custom_1624695412187{border-right-width: 1px !important;border-right-color: #dddddd !important;border-right-style: solid !important;border-radius: 1px !important;}”][vc_empty_space][megatron_heading title=”Abstract” size=”size-sm” text_align=”text-left”][vc_column_text]© 2016 Inderscience Enterprises Ltd.Cyclic steam stimulation (CSS) has succeeded in recovering bitumen and heavy oil. However, after the fifth cycle, the process is no longer effective as indicated by the increasing cumulative steam-oil ratio (cSOR). This paper proposes an improvement to the CSS performance by modifying the completion design. The perforation interval is divided into two parts: upper section (for injection) and lower section (for production). In such design, the injected steam would condense due to heat loss. The steam would then flow to the lower section because of gravity force and the oil starts to produce. The injection-production cycle is managed by an interval control valve (ICV). Simulation results show that the proposed design would reduce the cSOR up to 30% and increase the cumulative oil production by 3.5 times. It is also revealed that the longer the distance between the injection and production sections, the better the steam efficiency.[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Author keywords” size=”size-sm” text_align=”text-left”][vc_column_text]Cumulative oil production,Cumulative steam-oil ratios,Cyclic steam stimulations,Heat efficiency,Heavy oil recovery,Interval control valves,Production cycle,Recovery factors[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Indexed keywords” size=”size-sm” text_align=”text-left”][vc_column_text]CSS,Cyclic steam stimulation,Heat efficiency,Heavy oil,Recovery factor,Smart completion[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Funding details” size=”size-sm” text_align=”text-left”][vc_column_text][/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”DOI” size=”size-sm” text_align=”text-left”][vc_column_text]https://doi.org/10.1504/IJOGCT.2016.074289[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/4″][vc_column_text]Widget Plumx[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_column][/vc_row][vc_row][vc_column][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][/vc_column][/vc_row]