[vc_empty_space][vc_empty_space]
Evaluation of implementation viability gap funding (VGF) policy on toll road investment in Indonesia
Mahani I.a, Tamin R.Z.a, Pribadi K.S.a, Wibowo A.b
a Civil Engineering Program, Faculty of Civil and Environmental Engineering, ITB, Bandung, Indonesia
b Research Center of Residential Development, Ministry of Public Work and Housing, Indonesia
[vc_row][vc_column][vc_row_inner][vc_column_inner][vc_separator css=”.vc_custom_1624529070653{padding-top: 30px !important;padding-bottom: 30px !important;}”][/vc_column_inner][/vc_row_inner][vc_row_inner layout=”boxed”][vc_column_inner width=”3/4″ css=”.vc_custom_1624695412187{border-right-width: 1px !important;border-right-color: #dddddd !important;border-right-style: solid !important;border-radius: 1px !important;}”][vc_empty_space][megatron_heading title=”Abstract” size=”size-sm” text_align=”text-left”][vc_column_text]© 2017 Author(s).VGF policy for toll road investment in Indonesia must be reviewed. Since 2012 the Government of Indonesia (GOI) has issued viability gap funding (VGF) policy for PPP infrastructure project through ministry of finance decision (PMK) No.223/2012. One of VGF purpose is to improve the financial feasibility. In the toll road investment in Indonesia, the implementation of this policy has some problems. This study aimed to evaluate the policy by seeking implementation constraints so can be given an alternative. This research was conducted qualitatively, included aspects of implementation process VGF policy. The analysis process is based on literature study and in-depth interviews to related parties include business entity, ministry of finance, and the ministry of public works, Indonesia Toll Road Authority (BPJT) and professional societies. The literature review conducted by reviewing existing policies and best practices in countries that already practice VGF. The conclusion of this study are 1) There is a conflict of regulation in viability gap funding (VGF) for toll road investment in Indonesia; 2) If Government of Indonesia (GOI) want implement construction grant as VGF, so the regulation must improve in time limited for submission and clearly define limited given in regulation; 3) If GOI want implement partial construction as VGF, so the regulation must be improve in guideline for submission and given.[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Author keywords” size=”size-sm” text_align=”text-left”][vc_column_text][/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Indexed keywords” size=”size-sm” text_align=”text-left”][vc_column_text][/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Funding details” size=”size-sm” text_align=”text-left”][vc_column_text][/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”DOI” size=”size-sm” text_align=”text-left”][vc_column_text]https://doi.org/10.1063/1.5011582[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/4″][vc_column_text]Widget Plumx[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_column][/vc_row][vc_row][vc_column][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][/vc_column][/vc_row]