Enter your keyword

2-s2.0-84941142932

[vc_empty_space][vc_empty_space]

Integrated analysis of optimizing tubing material selection for gas wells

Marbun B.T.H.a, Sinaga S.Z.a, Gaol C.L.a, Arimbawa G.V.I.a, Pamungkas A.P.a, Hardama A.F.a, Rizkiaputra R.a

a Institut Teknologi Bandung, Bandung, 40132, Indonesia

[vc_row][vc_column][vc_row_inner][vc_column_inner][vc_separator css=”.vc_custom_1624529070653{padding-top: 30px !important;padding-bottom: 30px !important;}”][/vc_column_inner][/vc_row_inner][vc_row_inner layout=”boxed”][vc_column_inner width=”3/4″ css=”.vc_custom_1624695412187{border-right-width: 1px !important;border-right-color: #dddddd !important;border-right-style: solid !important;border-radius: 1px !important;}”][vc_empty_space][megatron_heading title=”Abstract” size=”size-sm” text_align=”text-left”][vc_column_text]©2015 Published by ITB Journal Publisher.Corrosion in production tubing strings is seen as a challenging problem in gas wells containing carbon dioxide and hydrogen sulfide. This paper presents a new comprehensive method of corrosion rate calculation with integrated study of reservoir condition, nodal analysis of the well, and well trajectory, which could also have an effect due to the possibility of different flow regimes of the production fluid. This method is applicable to evaluate and predict the performance of selected tubing size and material. This method can also give an economic evaluation for the consideration of using corrosion resistant alloy (CRA) or low-alloy steel and carbon steel. The measurement of corrosion rate can be done by several methods, such as using corrosion coupons, calculating the iron content inside the production fluid, or probes. Either way, when the corrosion rate measured in the field is still below the acceptable maximum corrosion rate, it can be said that the adequacy of this method is guaranteed. This method has been implemented in a gas field, where it successfully selected the best tubing material for the next development well in this field. Consequently, the lifetime of the tubing strings could be extended, resulting in an economical benefit as well.[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Author keywords” size=”size-sm” text_align=”text-left”][vc_column_text]Comprehensive method,Economic evaluations,Economical benefits,Gas well,Integrated analysis,Production tubing,Reservoir conditions,Tubingmaterial selection[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Indexed keywords” size=”size-sm” text_align=”text-left”][vc_column_text]Corrosion,Gas well,Integrated analysis,Production tubing,Tubingmaterial selection[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Funding details” size=”size-sm” text_align=”text-left”][vc_column_text][/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”DOI” size=”size-sm” text_align=”text-left”][vc_column_text]https://doi.org/10.5614/j.eng.technol.sci.2015.47.3.8[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/4″][vc_column_text]Widget Plumx[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_column][/vc_row][vc_row][vc_column][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][/vc_column][/vc_row]