Enter your keyword

2-s2.0-85060368003

[vc_empty_space][vc_empty_space]

Transient stability method to determine maximum intermittent power plant penetration to small island isolated system

Sasmono S.a, Chandra J.A.a, Wijaya A.a, Hariyanto N.b

a Quadran Energi Rekayasa, Bandung, Indonesia
b School of Electrical Engineering and Informatics, Institut Teknologi Bandung, Bandung, Indonesia

[vc_row][vc_column][vc_row_inner][vc_column_inner][vc_separator css=”.vc_custom_1624529070653{padding-top: 30px !important;padding-bottom: 30px !important;}”][/vc_column_inner][/vc_row_inner][vc_row_inner layout=”boxed”][vc_column_inner width=”3/4″ css=”.vc_custom_1624695412187{border-right-width: 1px !important;border-right-color: #dddddd !important;border-right-style: solid !important;border-radius: 1px !important;}”][vc_empty_space][megatron_heading title=”Abstract” size=”size-sm” text_align=”text-left”][vc_column_text]© 2018 IEEE.Integration of intermittent power plant into system will have a significant effect to the system. The intermittency of these renewable energy source will cause uncertainty in system operation. In small island, which is serve by small isolated system, defense scheme will set only to allow small change in system frequency. Transient stability, especially frequency stability of system is proposed methodology to determine maximum capacity of intermittent power plant which can penetrate such small isolated system. To strengthen the conclusion of the transient stability simulation is also carried out on the disturbance or fault condition. So, the maximum capacity of Solar PV can be connected to the system has a solid foundation.[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Author keywords” size=”size-sm” text_align=”text-left”][vc_column_text]Fault conditions,Intermittency,Isolated systems,Renewable energy source,Solar PVs,System frequency,System operation,Transient stability simulation[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Indexed keywords” size=”size-sm” text_align=”text-left”][vc_column_text]Intermittent Power Plant,Small isolated system,Solar PV,System frequency,Transient stability[/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”Funding details” size=”size-sm” text_align=”text-left”][vc_column_text][/vc_column_text][vc_empty_space][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][vc_empty_space][megatron_heading title=”DOI” size=”size-sm” text_align=”text-left”][vc_column_text]https://doi.org/10.1109/APPEEC.2018.8566468[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/4″][vc_column_text]Widget Plumx[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_column][/vc_row][vc_row][vc_column][vc_separator css=”.vc_custom_1624528584150{padding-top: 25px !important;padding-bottom: 25px !important;}”][/vc_column][/vc_row]